Today, we have a fantastic update. Coaster supports have arrived at Chessington World of Adventures.
The supports, painted brown in colour form the backbone of the new roller coaster. Bolted to the foundations that wrap around the site, the green steel track will then sit connected to the ground via these steel columns.
The support columns are currently located off of the construction site and will be moved into position when track arrives. Our photos were taken with permission from park staff. We must stress that you should never try to access a construction site or storage area without permission and support of the park.